Delivering affordable housing has never been more important, or more challenging.
Local authorities, housing associations and developers are under increasing pressure to bring forward schemes, but in 2026 the reality is clear: viability is tighter, risks are higher and certainty is harder to achieve.
So how do you move projects forward with confidence?
It comes down to three things: understanding cost pressures, maximising funding and making smarter procurement decisions.
Understanding the Cost Pressures
Construction cost inflation may have stabilised compared to previous years, but it hasn’t disappeared. Projects are still facing:
- Elevated baseline construction costs compared to pre-2020 levels
- Ongoing labour shortages in key trades
- Volatility in materials and supply chains
- Increased requirements around sustainability and building performance
At the same time, expectations haven’t reduced, particularly around quality, energy performance and placemaking.
The result?
Schemes that looked viable 12–18 months ago are now under pressure.
Without robust, up-to-date cost planning, projects can quickly drift beyond budget before they’ve even reached planning.
Bridging the Funding Gap
Funding remains a critical piece of the viability puzzle, but rarely covers the full picture.
Typical affordable housing schemes now rely on a blend of:
- Homes England Affordable Homes Programme funding
- Local authority funding streams (including HRA and RTB receipts)
- Brownfield and regeneration funding
- Borrowing, including PWLB
However, even with multiple funding sources, gaps are increasingly common. Closing that gap requires more than just securing funding, it requires:
- Early alignment between funding assumptions and cost plans
- Clear understanding of what funding will and won’t cover
- Ongoing viability testing as designs develop
Too often, schemes progress with optimistic assumptions, only to face difficult redesign or delays later.
Value Engineering – Done Properly
Value engineering is often misunderstood as “cutting cost.” In reality, it should be about maximising value without compromising the core objectives of the scheme.
The key is timing and structure.
The most effective value engineering happens:
- Early in the design process (RIBA Stage 2–3)
- With clear cost benchmarks and options analysis
- Through collaboration between client, design team and cost consultant
Typical strategies include:
- Reviewing unit mix and layouts for efficiency
- Simplifying structural and construction approaches
- Rationalising specifications without compromising performance
- Considering modern methods of construction where appropriate
When done correctly, value engineering protects the scheme. When done too late, it becomes reactive and disruptive.
Smart Procurement: Aligning Delivery with Budget
Procurement strategy can make or break the viability of an affordable housing scheme.
In 2026, there is no one-size-fits-all approach, but there is a growing need for flexibility and transparency.
Key considerations include:
Design & Build (D&B)
- Provides cost certainty at contract stage
- Transfers risk to the contractor
- Works well where the brief is clearly defined
Two-Stage Procurement
- Allows early contractor involvement
- Supports buildability input and cost alignment
- Reduces risk of pricing disconnects
Traditional Procurement
- Greater control over design
- Suitable where quality and specification are key drivers
- Requires strong cost control and risk management
Section 106 Acquisitions (Developer-Led Delivery)
An increasingly important route for local authorities is the acquisition of affordable housing through Section 106 agreements, where completed units are purchased directly from developers.
This approach can:
- Accelerate delivery without the need to directly manage construction
- Reduce upfront development risk
- Provide access to schemes that are already progressing through planning and delivery
However, “off-the-shelf” does not mean risk-free.
Without the right oversight, there can be:
- Limited visibility on build quality and specification
- Misalignment between developer proposals and employer requirements
- Reduced control over cost and long-term value
Acting as Employer’s Agent, we support clients by:
- Reviewing and negotiating development and Section 106 agreements
- Setting clear Employer’s Requirements to define quality and performance
- Monitoring design development and construction progress
- Providing cost and value assurance throughout
- Managing the process through to completion, handover and final certification
This ensures that acquisitions deliver not just units, but quality homes that meet long-term expectations.
The right approach depends on the scheme, but the common thread is this:
Procurement should be driven by the project’s constraints, not habit.
Packaging Works to Suit Budgets
Another often overlooked opportunity is how projects are packaged and delivered.
Breaking schemes into manageable packages can:
- Improve competitiveness in the supply chain
- Allow prioritisation of core deliverables vs optional scope
- Provide flexibility to align with funding drawdowns
- Enable phased delivery on regeneration sites
For example:
- Core housing units delivered first
- Ancillary or public realm works phased later
- Optional elements tendered separately
This approach gives clients greater control over spend and the ability to adapt as projects progress.
Creating Confidence in Delivery
Ultimately, making affordable housing viable in 2026 isn’t about one single solution.
It’s about bringing together funding, cost planning, design and procurement into a coordinated strategy, from the earliest stages of a project.
At Modus, we support clients from feasibility through to delivery with:
- Clear, realistic cost advice
- Ongoing viability testing
- Proactive value management
- Procurement strategies aligned to project objectives
- Employer’s Agent services to protect client interests through delivery and acquisition
The goal is simple:
Reduce risk, maintain control and create confidence in construction.